Figuring Out CIP Pay

atcbrownie

Trusted Contributor
Jun 14, 2008
661
9
18
Warrenton Va
Are you asking about CIP controller incentive pay or CIC controller in charge pay?

CIC is always 10% of base pay.
CIP is totally dependent on your facility, every facility (if,they have CIP) have different percentages
 

NovemberEcho

Epic Member
Dec 8, 2010
4,388
68
48
Long Island
is CIP only given to CPC's or do developmentals at the facility get it too? (probably says something in the link above buuuuut I'm lazy)
 

TimShady

Senior Analyst
Mar 12, 2009
887
5
18
33
Chicago
Is it just me or is that link from the white book or something? All it says about CIP is that it's being phased out, but the red book brought it back if I'm not mistaken.
 

mbalunda

Epic Member
Jan 31, 2009
2,867
15
38
This is from an older thread, the list is a few years old. Mine is still accurate, but it's possible there's been some changes.

Facility CIP Percentages Effective 10/11/1009

Fac ID CIP Percentage
A90 7.5%
ACK 8.0%
ACY 1.7%
ADS 2.0%
ADW 5.9%
APA 2.9%
APC 10.0%
ARB 5.3%
ARR 6.3%
ASE 8.0%
BDL 5.7%
BED 10.0%
BFI 5.7%
BJC 3.6%
BOS 7.5%
BUR 10.0%
BWI 1.7%
C90 8.0%
CCR 10.0%
CDW 10.0%
ATCSCC 4.6%
CMA 8.5%
CNO 2.0%
CRQ 7.1%
D01 3.2%
D21 2.4%
DAL 2.5%
DCA 3.3%
DEN 3.2%
DPA 5.6%
DTW 2.4%
EMT 10.0%
EWR 8.4%
FAI 8.0%
FCM 5.6%
FRG 10.0%
GCN 8.0%
GRR 1.1%
HEF 6.6%
HIO 1.5%
HPN 10.0%
HWD 10.0%
IAD 4.6%
ISP 10.0%
JFK 10.0%
LAN 1.1%
LAX 8.1%
LGA 10.0%
LGB 10.0%
LVK 10.0%
M98 4.2%
MDW 8.0%
MIC 5.6%
MKE 2.3%
MMU 6.7%
MRY 10.0%
MSN 0.7%
MSP 4.2%
N90 10.0%
NCT 3.2%
O90 10.0%
OAK 10.0%
OGG 3.7%
ONT 2.2%
ORD 10.0%
P80 0.9%
PAE 3.1%
PAO 10.0%
PDX 0.9%
PHL 3.1%
PNE 6.4%
POC 10.0%
POU 2.8%
PSP 3.6%
PTK 2.0%
PVD 5.6%
PWK 10.0%
PWM 1.5%
RHV 10.0%
RNO 1.4%
ROC 1.9%
S46 7.0%
SAN 7.0%
SBA 10.0%
SCK 1.4%
SCT 7.4%
SEA 7.0%
SEE 7.1%
SFO 10.0%
SJC 10.0%
SJU 4.0%
SMF 3.5%
SMO 10.0%
SNA 6.8%
STP 3.3%
STS 10.0%
TEB 10.0%
TMB 3.6%
TOA 10.0%
TUS 1.7%
U90 1.4%
VNY 10.0%
Y90 4.6%
YIP 4.0%
ZAU 5.1%
ZDC 4.6%
ZMA 1.8%
ZNY 10.0%
ZOA 10.0%
ZSE 3.1%
ZSU 3.1%